
All News Bulletins
Infrastructure
High-Capacity Floating Pontoon Bridges Installed at Major Sangam Ghats
K
Kumbh AdminJuly 20, 2026Engineering Feat Across Sacred Rivers
Civil engineering teams have completed the installation of 22 heavy-duty floating pontoon bridges connecting outer camp sectors directly to the primary bathing ghats.
Structural Details
- Load Capacity: Engineered to support continuous heavy foot traffic and emergency vehicles.
- Safety Guardrails: High-intensity LED lighting and anti-slip wooden decking.
- One-Way Traffic Flow: Separate bridges designated strictly for entry and exit movement.
Related Announcements

Centralized GPS Navigation and Offline Mobile App Launched for Pilgrims
Jul 16Read

Simhastha Kumbh Mela: Maharashtra CM Devendra Fadnavis fast-tracks infra preparations for global devotees
Jun 23Read

Nashik-Trimbakeshwar Ring Road Development Approved for Kumbh Mela 2027
Jun 18Read
Loading discussion & reviews...